Lead Time
1. Knit Product: Of 45-60 days from the date of order confirmation. However, it all depends on quality, number of color, approval of lab-dip; space available in the factory etc. lead time can be optimized for repeat order to 30 days.
2. Woven Product: If Local fabric than lead time will be 60 days and if Import fabric than lead time will be 120days to 90 days.
3. Sweater Product: If Local fabric than lead time will be 60 days or 90 days and if Import fabric than lead time will be 100 days to 120 days.